The following items should be paid attention to during the working process of circulating fluidized bed boiler:

1. During the cooking period, the medium and low water level must be ensured. When the furnace is cooking, the liquid medicine must not enter the super heater, so as to prevent the suspended solids from depositing in the serpentine tube and causing blockage. After the boiler is finished, the boiler should be shut down for waterproofing, the attachments and residues on the inner wall of the super heater should be thoroughly cleaned, and the super heater should be rinsed with soft water for about 2 hours before trial operation.

2. The super heater exhaust valve and trap must be opened before ignition. When the pressure rises, close the exhaust valve and open the sub-cylinder intake valve and trap at the same time. When the drum pressure reaches the specified value, close the trap until about 10% of the flow rate, then close the trap.

Precautions-for-Circulating-Fluidized-Bed-Boilers.jpg

3. During operation, if the furnace temperature is high, the desuperheating water flow should be opened. At this time, the trap should be closed, and the desuperheating water flow should be turned off and the trap should be opened at the same time.

4. During the operation of the boiler, if the desuperheating water has increased to the maximum, the steam temperature of the super heater is still very high, and the steam temperature can be reduced by the following methods:

(1) Increase the circulating ash volume of the boiler and reduce the particle size of the coal feed.

(2) Appropriately reduce the amount of coal fed and lower the furnace temperature.

(3) Under the condition of oxygen permit, the secondary air can be appropriately reduced.

5. If the desuperheating water is turned off and the steam temperature of the super heater is still low, the steam temperature can be increased by the following methods:

(1) Let off some circulating ash and increase the temperature of the flue gas at the outlet of the furnace.

(2) The secondary air volume can be appropriately increased.

6. Before operating the boiler, carefully check the internals of the drum, and require tight welds and no leaks.

7. Strictly control the burning of high-sulfur coal to prevent high-temperature corrosion of the super heater.

8. Regularly check the abrasion resistance of the high temperature super heater. The worn-out protective tile should be repaired even if it is welded, the worn-out protective tile should be replaced immediately, and the steering protective tile should be corrected immediately.

9. During the operation of the boiler, the blowdown operation shall be strengthened, continuous blowdown shall not be interrupted, and regular blowdown shall not be less than once per shift.

Want to know more details about circulating fluidized bed (CFB) boilers? Welcome to consult online customer service, or directly call +86 177 1999 3430, ZBG Boiler Group will serve you wholeheartedly!

Horizontal Water Tube Steam Boiler Manufacturer

XHJ boiler factory have many years produce experience for water tube boiler, quality very reliable. XHJ manufacture two types horizontal water tube steam boiler, SZS series gas & oil fired horizontal type water tube steam boiler and SZL series horizontal chain grate coal and biomass fired water tube steam boiler for sale

2026-07-31
XHJ Boiler Exports More Countries and regions

As a professional industrial boiler manufacturer, XHJ has continuously improved product quality, manufacturing processes, and after-sales service in recent years in response to growing global demand for steam and hot water boilers. Its products are now exported to more than 70 countries and regions across Asia, Africa, the Middle East, Europe, and South America.

2026-07-23
In 2023, ZBG Group Successfully Passed the Asme Renewal Review

Recently, after being reviewed by the joint inspection team of the American Society of Mechanical Engineers (ASME), ZBG Group successfully passed the renewal

2025-07-13
14000kw Gas Hot Water Boiler With Asme Certification

The 14000kw gas-fired hot water boiler here refers to a 14MW, which is a 20-ton gas fired hot water boiler. The 14,000kw gas-fired hot water boiler produced

2025-05-08
ZBG Group 6 Ton Gas Fired Steam Boiler Sent to Kazakhstan

Recently, the 6 ton gas fired steam boiler produced by ZBG Group, the boiler model is WNS6-1.6-YQ, is being delivered in an orderly manner. It is reported th

2025-04-24
In July 2022, ZBG Group Gas Boilers Are Busy With Delivery

In the midsummer of July, the enthusiasm is like fire. Since the first half of the year, the ZBG production plant has been busy, and ZBG gas boiler orders have been sent to home and abroad in batches to help users in various industries in green and energy-saving production and implement the dual-carbon target strategy.

2024-08-18
Reasonable Price of 20 T/H Coal Gas & Heavy Oil Fuel Boiler With ASME

Reasonable Price of 20 T/H Coal Gas & Heavy Oil Fuel Boiler With ASME. Fuel:Coal Gas & Heavy oil fuel Boiler, Boiler output requirements: 20t/h, <= 31barA, saturation at 250C

2023-12-06
Good News | ZBG Shares Won the Bid for the Waste Heat Boiler Project in Hebei Carbon Industry

Good News | ZBG Shares Won the Bid for the Waste Heat Boiler Project in Hebei Carbon Industry. The total steam volume of the project is 90t/h, with a total of four vertical carbon waste heat boilers, including two 20t/h waste heat boilers, model: Q57.6/850-20-2.45/400; two 25t/h waste heat boilers , The model is: Q72.5/850-25-2.45/400.

2023-10-21
Price List for the 4000 Kg/Hr Steam Boiler, Working Pressure Up to 16 Bars

Price List for the 4000 Kg/Hr Steam Boiler, Working Pressure Up to 16 Bars, Horizontal, 3 passes, wet back, boiler thermal output up to 4000 kg/hr, working pressure up to 16 bars.

2023-09-16
Congratulate! the 98-ton/hour Carbon Kiln Waste Heat Boiler Project in Qujing, Yunnan Was Successful

On June 7th, in Qujing, Yunnan, under the witness of ZBG Boiler technical engineers and users, with the continuous supply of steam, ZBG Boiler 98t/h carbon kiln waste heat boiler was successfully tested and the overall performance indicators of the boiler were excellent. As a key project in Yunnan Province, the 900,000-ton anode carbon project of Yunnan Suotong Yunlu has received great social and media attention, and mainstream media in Yunnan Province have rushed to report it

2023-09-02
Products Recommended
SZL Series Biomass Chain Grate Boiler
SZL Series Biomass Chain Grate Boiler 6-30 t/ 4.2-21 MW
Pressure: ≤1.6MPa
SZS Gas & Oil Water Tube Boiler
SZS Gas & Oil Water Tube Boiler 4-90t/2.8-63 MW
Pressure: ≤3.82MPa
DZL Packaged Biomass Steam Boiler
DZL Packaged Biomass Steam Boiler 2-10 t/1.4-7 MW
Pressure: ≤1.6MPa
WNS Oil & Gas Fire Tube Boiler
WNS Oil & Gas Fire Tube Boiler 1-20Ton/1.4-14MW
Pressure: ≤1.6MPa
Checking Order Quality Test Before Delivery Check Items When Packing Packaging And Transport
Get An Instant Quotation

For all inquiries, please fill in the form below (* are required) to send us a brief message, and we will get back to you as soon as possible.

Product:
* Email:
Tel:
Name:
Boiler fuel:
  • Gas
  • Oil
  • Biomass
  • Coal
  • Waste Heat
  • Other
Application:
  • Textile Industry
  • Central Heating
  • Food Plant
  • Power Plant
  • Chemical Industry
  • Waste Heat Recovery
  • AAC Block Plant
  • Hotel & Resort
  • CHP
  • Other