Technical Parameters of WNS3-1.25-Y Gas Fired Steam Boiler
| NO. | Q'TY | |||
| EQUIPMENT | DESCRIPTION | UNIT | ||
| 1 | Steam Boiler | WNS3-1.25Y | set | 2 |
| Rating Steam Quantity:3t/h | ||||
| Rating Pressure:1.25 MPa | ||||
| Feedwater Temperature:20℃ | ||||
| Fuel:Light Diesel | ||||
| Fuel Consumption:186kg | ||||
| Dimension:4691x2860x2662 | ||||
| Combusion Machine | Power Consumption:9.6kW 380V | |||
| Length:1145 | ||||
| Chimney | Steeliness:D500 12m | pc | 2 | |
| Boiler Feedwter Pump | KDP40-8-8×17 | set | 2 | |
| Q=6.0 m3/h, H=153 mH2O | ||||
| Motor | N=7.5 kW | |||
| Steam Pump | QB-3 | pc | 1 | |
| Q=3~6 m3/h | ||||
| Full Automatic Soft Water Machine | WD-6B | pc | 1 | |
| Water Treatment Capacity:6 m3/h | ||||
| Power Consumption:40W 220V | ||||
| 外形尺寸:2500x2000x2500 | ||||
| Normal Termperature Filter Deoxy Machine | TDZY-6 | pc | 1 | |
| Water Treatment Capacity:6 m3/h | ||||
| Intellectualized Heat Switch | ZSA2-10000, 815kW heat exchange | set | 1 | |
| Quantity of Heat 815kW | Steam Consumption:1.25t/h(0.4Mpa) | |||
| Feed Backwater Temperature:95-70℃ | ||||
| Circle Water Quantity:27 m3/h | ||||
| Circle Water Pump | N=4.0 kW | |||
| Water Pump | N=0.55kW | |||
| Dimension:1700x1000x1400 | ||||
| Coagulate Water Pump | KLR32-125 | set | 2 | |
| Q=6.5 m3/h H=18 mH2O | ||||
| Motor | N=0.75kW | |||
| Sewerage and Cooling Pool | D1500 | pc | 1 | |
| Continuing Sewerage expand Machine | LP-0.75 | pc | 1 | |
| Soft Water Box | 3200×2200×2400 | pc | 1 | |
| Coagulate Water Pool | 2000X2000X2000 | pc | 1 | |
| Dispatched Cylinder | D360 L=2655 | pc | 1 | |
| Sampling Cooler | φ254 | pc | 3 | |
| Test Equipment | set | 1 | ||
| Oil Tank | Steeliness:D3000 L=7000 30 m3 | pc | 2 | |
| Mediate Oil Tank | Steeliness:1000X1000X1000 | pc | 1 | |
| Oil Conveyer Pump | KLWB-20-110 Q=1.8m3/h H=16mH2O | pc | 2 | |
| Motor | N=0.37kW | |||
| Heat Exchanger for Shower | SHQR-350-1.4-T-P | pc | 1 | |
| 21.8m3 Water Production,770kW Heat Exchange | ||||
| Electrical Temperature Control Valve | DN100 | pc | 1 | |
| 2 | Boiler House Equipment Installation | |||
| Check Valve | J11T-16 DN150 | pc | 2 | |
| Check Valve | J11T-16 DN100 | pc | 8 | |
| Check Valve | J11T-16 DN80 | pc | 2 | |
| Check Valve | J11T-16 DN50 | pc | 8 | |
| Check Valve | J11T-16 DN40 | pc | 10 | |
| Check Valve | J11T-16 DN32 | pc | 2 | |
| Isolator Valve | Z15T-10 DN50 | pc | 3 | |
| Isolator Valve | Z15T-10 DN40 | pc | 12 | |
| Electric Regulater | DN32 | pc | 2 | |
| Dewatering Machine | FT10-10 DN40 | pc | 2 | |
| Rubber Flexibility End | YJ1-XX-1.2 DN50 | pc | 4 | |
| No-return Valve | CLSZ-100 | pc | 2 | |
| No-return Valve | CLSZ-40 | pc | 4 | |
| seamless Steel Pipe | D159X4.5 | m | 28 | |
| seamless Steel Pipe | D133X4 | m | 21 | |
| seamless Steel Pipe | D108X4 | m | 18 | |
| seamless Steel Pipe | D89X3.5 | m | 16 | |
| seamless Steel Pipe | D73X3.5 | m | 16 | |
| seamless Steel Pipe | D59X3.5 | m | 18 | |
| seamless Steel Pipe | D45X3.0 | m | 16 | |
| Flashboard Valve | D500 | 个 | 2 | |
| Heat Preservation Material | Heat Insulation Material | m3 | 3 |