 320m2 sintering area of ​​iron and steel plant with 12.8 tons sintering machine waste heat boiler project

1. Meteorological conditions

2. Sintering Process System Parameters

Table 1 Design parameters of main equipment of 320m2 sintering machine

project unit parameter Remark
Sintering Machine Effective area 324  
quantity tower 1  
Number of working days d/a ≥330  
Utilization factor t/(m2.h) ≥1.15  

Table 2 Parameters of hot air resources used by the large flue of 320m2 sintering machine

Operating conditions 17# 18# 19# 20# twenty one# Average temperature (°C)
Minimum (°C) 385 365 425 405 395 395
Normal (°C) 400 420 440 420 410 410
Maximum (°C) 415 435 455 435 425 425
The flow rate of each dust control branch pipe m3/h
Operating conditions 17# 18# 19# 20# twenty one# total
Single flue branch flow 39750 39750 39750 39750 39750 198750
Double flue branch pipe flow 79500 79500 79500 79500 79500 397500

3. Main design parameters of waste heat recovery device:

serial number project unit value
1 superheated steam pressure MPa 1.6 (gauge pressure)
2 superheated steam temperature 320
3 Rated evaporation t/h 12.8 (factory accounting)
4 Feed water temperature 151
5 Exhaust gas volume Nm3/h 170000 (factory accounting)
6 Flue gas side resistance loss Pa ≤350
7 boiler efficiency % (factory accounting)
8 Boiler evaporation area m2 (factory accounting)
9 Exhaust smoke temperature after waste heat recovery in large flue ≥125
Two 5t/h Low-temperature and Low-pressure Waste Heat Boilers Are Equipped With 1.2mw Generator Sets

Type Selection and Technical Parameters of Guangdong 5t/h Low Temperature and Low Pressure Waste Heat Boiler1. Flue gas waste heat conditions of the project1)

2023-08-28
Scope of Supply for Design and Supply of Waste Heat Recovery Boiler for Sinter Cooler

Waste heat boiler design scope of supply:All main and auxiliary equipment, materials and designs within the range of waste heat boiler units (except for addit

2023-08-10
Sintering Area 320m2 Large Flue Built-in Waste Heat Boiler System Project

320m2 sintering area of ​​iron and steel plant with 12.8 tons sintering machine waste heat boiler project1. Meteorological conditions Average temperature

2023-08-07
5 Tons/hour Waste Heat Boiler Performance Parameters and Supply List

5 Tons/hour Waste Heat Boiler Performance Parameters and Supply ListTechnical Parameters 5 tons/hour waste heat boiler tech

2023-08-03
170t/h Cdq Waste Heat Recovery Boiler Supply Equipment List

170t/h Cdq Waste Heat Recovery Boiler Supply Equipment List 1 Steam drum and internal device of steam drum

2023-07-31
Waste heat boiler manufacturers flue gas conditions and scope of supply items

Flue gas conditions at the inlet of the waste heat boiler Waste heat boiler inlet flue gas volume: 129400Nm3/h Waste heat boiler inlet flue gas temperatu

2023-07-24
How to operate the performance inspection and assessment of waste heat boiler?

The performance guarantee value assessment is organized by the owner, with the participation of the buyer and the seller, and is carried out under the condit

2023-07-17
How long is the life of waste heat boiler?

The waste heat boiler shall be designed and manufactured according to the corresponding indicators of national standards and current industry standards. The

2023-07-06
Sichuan Iron and Steel Plant 260㎡ sintering machine large flue built-in boiler waste heat recovery p

Technical conditions1 Meteorological conditions The extreme maximum temperature over the years is 42 ℃ The extreme minimum temperature over the years -2

2023-06-25
Q=8-10t/h P=1.3MPa T=193℃ Parameters and process of membrane wall waste heat boiler

(1) Process descriptionAfter leaving the secondary combustion chamber, the high-temperature flue gas enters the waste heat boiler. On the one hand, heat energ

2023-06-19
Products Recommended
Vulcanization Tank
Vulcanization Tank Customized
Pressure: 0.45-1.3MPa (4.5 - 13bar)
DHL Corner Tube Biomass Fired Bo
DHL Corner Tube Biomass Fired Bo 10-160 t/7-112 MW
Pressure: ≤5.29MPa
Biomass Power Plant Boiler
Biomass Power Plant Boiler 10 - 75 t/ 7-52.5 MW
Pressure: ≤5.29MPa
Biomass Fired CFB Boiler
Biomass Fired CFB Boiler 20-280 t/ 14-196 MW
Pressure: ≤5.29MPa
Success Stories
100 Tons CFB Boiler in Zhengjian
100 Tons CFB Boiler in Zhengjian Application: Thermal Power Plant
Capacity: 100 Tons
1 Ton Gas Steam Boiler in Chile
1 Ton Gas Steam Boiler in Chile Application: Rubber Vulcanization
Capacity: 1 Ton/hr
6 ton biomass steam boiler in Ir
6 ton biomass steam boiler in Ir Application: paper industry
Capacity: 6 ton
15 ton diesel steam boiler in Pu
15 ton diesel steam boiler in Pu Application: tire factory
Capacity: 15 ton
Checking Order Quality Test Before Delivery Check Items When Packing Packaging And Transport
Get An Instant Quotation

For all inquiries, please fill in the form below (* are required) to send us a brief message, and we will get back to you as soon as possible.

Product:
* Email:
Tel:
Name:
Boiler fuel:
  • Gas
  • Oil
  • Biomass
  • Coal
  • Waste Heat
  • Other
Application:
  • Textile Industry
  • Central Heating
  • Food Plant
  • Power Plant
  • Chemical Industry
  • Waste Heat Recovery
  • AAC Block Plant
  • Hotel & Resort
  • CHP
  • Other