Media Center
HomeMedia CenterXHJ Info

170t/h Cdq Waste Heat Recovery Boiler Supply Equipment List

2023-07-31 08:33:17

 170t/h Cdq Waste Heat Recovery Boiler Supply Equipment List

  1 Steam drum and internal device of steam drum 1 set  
  2 primary superheater 1 set  
  3 Secondary superheater 1 set  
  4 Membrane water wall 1 set  
  5 high temperature evaporator 1 set  
  6 low temperature evaporator 1 set  
  7 Economizer 1 set  
  8 boiler steel frame 1 set  
  9 Boiler platform, escalator 1 set  
  10 Boiler body expansion joint 1 set  
  11 Suspension 1 set  
  12 Design and manufacture of steam and water pipelines and supports and hangers within the scope of the boiler body 1 set  
  13 Design and manufacture of steam and water pipes and supports and hangers outside the boiler 1 set  
  14 Valves within the scope of the boiler body 1 set  
  15 inflation indicator 1 set  
  16 Circulating gas system between boiler inlet flange and outlet flange 1 set  
  17 Boiler Masonry Materials 1 set  
  18 Boiler insulation and protective layer materials (non-asbestos products) 1 set  
  19 Pipe insulation and protective layer materials within the scope of the boiler body 1 set  
  20 Boiler roof exhaust muffler and piping 1 set  
  twenty one Main steam release pipe silencer and piping 1 set  
  twenty two Instruments within the scope of the boiler body (including local meters, local parts of remote instruments, steam drum pressure balance vessels, boiler drum upper and lower wall temperature, secondary superheater coiled tube metal wall temperature instruments, etc.) 1 set  
  twenty three Filter and pressure gauge of the desuperheater water pipeline before the desuperheater 1 set  
  twenty four Boiler water sampler, sampling tube and valve 1 set  
  25 Saturated steam sampler, sampling tube and valve 1 set  
  26 Superheated steam sampler, sampling pipe and valve 1 set  
  27 Main feed water sampler, sampling pipe and valve 2 sets  
  28 Drum safety valve (2 pieces), superheater safety valve (1 piece) 1 set  
Two 5t/h Low-temperature and Low-pressure Waste Heat Boilers Are Equipped With 1.2mw Generator Sets

Type Selection and Technical Parameters of Guangdong 5t/h Low Temperature and Low Pressure Waste Heat Boiler1. Flue gas waste heat conditions of the project1)

2023-08-28
Scope of Supply for Design and Supply of Waste Heat Recovery Boiler for Sinter Cooler

Waste heat boiler design scope of supply:All main and auxiliary equipment, materials and designs within the range of waste heat boiler units (except for addit

2023-08-10
Sintering Area 320m2 Large Flue Built-in Waste Heat Boiler System Project

320m2 sintering area of ​​iron and steel plant with 12.8 tons sintering machine waste heat boiler project1. Meteorological conditions Average temperature

2023-08-07
5 Tons/hour Waste Heat Boiler Performance Parameters and Supply List

5 Tons/hour Waste Heat Boiler Performance Parameters and Supply ListTechnical Parameters 5 tons/hour waste heat boiler tech

2023-08-03
170t/h Cdq Waste Heat Recovery Boiler Supply Equipment List

170t/h Cdq Waste Heat Recovery Boiler Supply Equipment List 1 Steam drum and internal device of steam drum

2023-07-31
Waste heat boiler manufacturers flue gas conditions and scope of supply items

Flue gas conditions at the inlet of the waste heat boiler Waste heat boiler inlet flue gas volume: 129400Nm3/h Waste heat boiler inlet flue gas temperatu

2023-07-24
How to operate the performance inspection and assessment of waste heat boiler?

The performance guarantee value assessment is organized by the owner, with the participation of the buyer and the seller, and is carried out under the condit

2023-07-17
How long is the life of waste heat boiler?

The waste heat boiler shall be designed and manufactured according to the corresponding indicators of national standards and current industry standards. The

2023-07-06
Sichuan Iron and Steel Plant 260㎡ sintering machine large flue built-in boiler waste heat recovery p

Technical conditions1 Meteorological conditions The extreme maximum temperature over the years is 42 ℃ The extreme minimum temperature over the years -2

2023-06-25
Q=8-10t/h P=1.3MPa T=193℃ Parameters and process of membrane wall waste heat boiler

(1) Process descriptionAfter leaving the secondary combustion chamber, the high-temperature flue gas enters the waste heat boiler. On the one hand, heat energ

2023-06-19
Products Recommended
Vulcanization Tank
Vulcanization Tank Customized
Pressure: 0.45-1.3MPa (4.5 - 13bar)
DHL Corner Tube Biomass Fired Bo
DHL Corner Tube Biomass Fired Bo 10-160 t/7-112 MW
Pressure: ≤5.29MPa
Biomass Power Plant Boiler
Biomass Power Plant Boiler 10 - 75 t/ 7-52.5 MW
Pressure: ≤5.29MPa
Biomass Fired CFB Boiler
Biomass Fired CFB Boiler 20-280 t/ 14-196 MW
Pressure: ≤5.29MPa
Success Stories
100 Tons CFB Boiler in Zhengjian
100 Tons CFB Boiler in Zhengjian Application: Thermal Power Plant
Capacity: 100 Tons
1 Ton Gas Steam Boiler in Chile
1 Ton Gas Steam Boiler in Chile Application: Rubber Vulcanization
Capacity: 1 Ton/hr
6 ton biomass steam boiler in Ir
6 ton biomass steam boiler in Ir Application: paper industry
Capacity: 6 ton
15 ton diesel steam boiler in Pu
15 ton diesel steam boiler in Pu Application: tire factory
Capacity: 15 ton
Checking Order Quality Test Before Delivery Check Items When Packing Packaging And Transport
Get An Instant Quotation

For all inquiries, please fill in the form below (* are required) to send us a brief message, and we will get back to you as soon as possible.

Product:
* Email:
Tel:
Name:
Boiler fuel:
  • Gas
  • Oil
  • Biomass
  • Coal
  • Waste Heat
  • Other
Application:
  • Textile Industry
  • Central Heating
  • Food Plant
  • Power Plant
  • Chemical Industry
  • Waste Heat Recovery
  • AAC Block Plant
  • Hotel & Resort
  • CHP
  • Other