1. Gas consumption: gas consumption (per hour) = gas boiler power * time / fuel calorific value / gas boiler heat value utilization.
Power of 10 tons gas boiler is 7MW, the fuel calorific value calculated according to 35.53MJ / Nm3, boiler thermal efficiency 90%. Therefore, 1 hour consumption of 10 tons natural gas boiler = 7MW * 3600s / 35.53MJ / Nm3 / 90% = 788m3 / h.
Fuel costs: 788m3 / h * gas price.
2. Electricity costs: general power consumption include burner, water pump, electric control cabinet, water treatment equipment, according to data provided by the engineer/hour is about 130 degrees, 130 * industrial electricity price.
3. Labor costs: 10 tons natural gas boilers, equipped with one management staff , two shifts of four homework personnel, one water treatment staff, one regular part-time maintenance staff .
4.Water: gas steam boiler to produce 10 tons of hot water needs 10-11 tons of water./
5. Maintenance costs: This includes the annual inspection of boiler, daily cleaning, warranty and so on.

Products Recommended
DHL Corner Tube Biomass Fired Bo
DHL Corner Tube Biomass Fired Bo 10-160 t/7-112 MW
Pressure: ≤5.29MPa
Biomass Power Plant Boiler
Biomass Power Plant Boiler 10 - 75 t/ 7-52.5 MW
Pressure: ≤5.29MPa
Biomass Fired CFB Boiler
Biomass Fired CFB Boiler 20-280 t/ 14-196 MW
Pressure: ≤5.29MPa
DZL Packaged Biomass Steam Boile
DZL Packaged Biomass Steam Boile 2-10 t/1.4-7 MW
Pressure: ≤1.6MPa
Success Stories
3 Tons Gas Fired Boiler Exported
3 Tons Gas Fired Boiler Exported Application: Building materials industry
Capacity: 3 tons
49 Tons Waste Heat Steam Boiler
49 Tons Waste Heat Steam Boiler Application: Chemical industry
Capacity: 49 tons
Indonesia Customer Ordered 2 Set
Indonesia Customer Ordered 2 Set Application: Dry cleaning industry
Capacity: 8 ton
60 Ton CFB Power Plant Boiler Pr
60 Ton CFB Power Plant Boiler Pr Application: Power plant
Capacity: 60 tons
Checking Order Quality Test Before Delivery Check Items When Packing Packaging And Transport
Get An Instant Quotation

For all inquiries, please fill in the form below (* are required) to send us a brief message, and we will get back to you as soon as possible.

Product:
* Email:
Tel:
Name:
Boiler fuel:
  • Gas
  • Oil
  • Biomass
  • Coal
  • Waste Heat
  • Other
Application:
  • Textile Industry
  • Central Heating
  • Food Plant
  • Power Plant
  • Chemical Industry
  • Waste Heat Recovery
  • AAC Block Plant
  • Hotel & Resort
  • CHP
  • Other