What Causes Boiler Tube Corrosion During Shutdown Period

2015-07-27 12:11:03

Boiler maintenance is very important no matter when it is operating or it is in shutdown period. But some enterprise neglect the shutdown boiler maintenance, resulting the accelerated boiler tube corrosion caused by the chemical corrosion that produced in its working period. Waste heat boiler tube corrosion may be caused by the following aspects:

waste heat recovery boiler
Boiler operator lacks professional skills training

The boiler operators have a lack in basic boiler maintenance knowledge, they do not follow the related boiler operation requirement to choose right maintenance methods, which lead to different aspects and levels waste heat boiler chemical corrosion problems.
Boiler stays too long outside

New installed, repaired, or moved boilers are exposed outdoors for too long, and no appropriate protection measures are taken. Too much rain will cause the boiler corrosion.
Maintenance measure for shutdown boiler

The basic requirement for boiler maintenance is to keep the air from entering into boiler's flue gas system. The boiler surface should keep dry, we have dry maintenance, pressure maintenance, wet maintenance, gas-filled maintenance, etc. The specific measure is depended on its shutdown period.

Waste heat boiler tube corrosion problems

A waste heat boiler tube corrosion often cause serious problems, tube corrosion may lead to boiler tube leakage, finally even cause whole boiler explosion. The main reasons that may cause waste heat boiler corrosion leakage are superheater tube corrosion, evaporator tubes corrosion,  economizer pipe corrosion. To avoid waste heat boiler accidents, enterprises should often inspect the boiler and take proper maintenance during boiler shutdown.  

Products Recommended
Vulcanization Tank
Vulcanization Tank Customized
Pressure: 0.45-1.3MPa (4.5 - 13bar)
DHL Corner Tube Biomass Fired Bo
DHL Corner Tube Biomass Fired Bo 10-160 t/7-112 MW
Pressure: ≤5.29MPa
Biomass Power Plant Boiler
Biomass Power Plant Boiler 10 - 75 t/ 7-52.5 MW
Pressure: ≤5.29MPa
Biomass Fired CFB Boiler
Biomass Fired CFB Boiler 20-280 t/ 14-196 MW
Pressure: ≤5.29MPa
Success Stories
Two Sets of 35 Ton Gas fired ste
Two Sets of 35 Ton Gas fired ste Application: Heating supply
Capacity: 70 tons
Vulcanization Tank Exported to C
Vulcanization Tank Exported to C Application: Rubber vulcanization process
Capacity:
Vulcanization Tank Project in Uk
Vulcanization Tank Project in Uk Application: Rubber vulcanization process
Capacity:
3 Tons Gas Fired Boiler Exported
3 Tons Gas Fired Boiler Exported Application: Building materials industry
Capacity: 3 tons
Checking Order Quality Test Before Delivery Check Items When Packing Packaging And Transport
Get An Instant Quotation

For all inquiries, please fill in the form below (* are required) to send us a brief message, and we will get back to you as soon as possible.

Product:
* Email:
Tel:
Name:
Boiler fuel:
  • Gas
  • Oil
  • Biomass
  • Coal
  • Waste Heat
  • Other
Application:
  • Textile Industry
  • Central Heating
  • Food Plant
  • Power Plant
  • Chemical Industry
  • Waste Heat Recovery
  • AAC Block Plant
  • Hotel & Resort
  • CHP
  • Other