1) PERFORMANCE:

Fuel data, feed water, adjustments and boiler operation, must follow the parameters set out in items Operating data and efficiently supply feed water parameters.

The predictive and preventive maintenance should follow the applicable methods for boilers and pressure vessels. With the condition the technical and operational parameters set out above, ensure the following performance characteristics:

► Total steam generating capacity of 15,000 kg / h

► Saturated steam at a temperature of 360 ° C

► Pressure 25 bar (g)

► Output Gas Temperature at 160 ° C

► Load operating range of 60% to 100% - maximum regime condition.

► Emitting Levels less than 730 mg / Nm³

2) MECHANICAL:

The Supplier grants warranty manufacturing deffects for a period of XXX months from the date of equipment operation initially limited to XXX months from the billing date.

► Operating within the manufacturer's specifications.

► Realization of preventive maintenance listed.

► Repairs and adjustments by the supplier or authorized technicians.

► Customer should inform the supplier, in the shortest possible time any unusual occurrence with the equipment, for appropriate action.

► In the event of an abnormality in the equipment, the customer must provide the same for a minimum period required for the supplier to determine the causes.

► For accessories and materials provided by third parties, will be transferred to the guarantee provided by their manufacturers to the supplier. If the installation of the equipment does not occur within the prescribed period, the incidence guarantee the equipment will occur on the following conditions:

► Packaging and storage of the components of the equipment properly, away from aggressive agents.

► boiler components that have a useful life shorter than the warranty period, under normal conditions of use.

► Repairs or replacements of components of the equipment by the supplier during the warranty period do not extend the original warranty period.

► All and any component replaced under warranty on the equipment is owned by the supplier

► The warranty is limited to the supplied equipment, not the possible emerging or consequential damages occurring to third parties, facilities, lost profits and other equipment. Warranty on the assembly will take place over the same period of manufacturing guarantee, provided that it is performed by the supplier. All assemblies under the customer's responsibility, it must send the supplier, a copy of the tech document, settled and signed by the engineer responsible for the initial inspection.

15000 Kg/h Biomass Steam Boiler .jpg

15000 Kg/h Biomass Steam Boiler 

SUPPLY LIMITS

1 - Fuel Feed System: From the entrance of the dosing garner biomass boiler.

2 – Water Feed Line: At the entrance thread of the condensate tank.

3 - Main Steam Line: In the counterflange of the steam outlet valve. Will be provided: Flange, counterflange, shutoff valve, gaskets and screws.

4 - Discharge lines of safety valves: At the exit of thread safety valves when the valves are threaded. The output counterflange of the valves when the valves are flanged. Will be provided: Counterflange, gasket and screws.

5 - Discharge lines: At the exit of the dump tank bottom (damper).

6 – Compressed Air Lines: The respective lines are customer scope.

7 - Combustion Gases Line: In the chimney outlet.

8 - Mechanical and Electrical Assembly: Take part in delivery assembly of the boiler and peripherals.

9 – Eletrical Interconnection: In the CCM input terminals, default project, the respective interconnections between CCM and peripherals, are scope of the supplier.

Inspection & Testing by supplier.

TRAINING

If the assembly of the equipment is the customer's responsibility, the supplier provide a supervisor for assembly, commissioning and startup, being under responsibility of the client the hours of labor costs, displacement, accommodation, food and materials transport.

 

In this phase will be carried out field tests, such as alignment, vibration, turning empty, calibrations and other operational tests. It is fundamental the full presence of professionals involved with the subsequent operation and maintenance. After the departure procedures, the equipment passes the testing phase, susceptible to operational adjustments.

 

How to Prevent Coking in Biomass Boilers

Why Are Biomass Boilers Prone to Coking? As a professional manufacturer of biomass boilers, XHJ has analyzed the causes of coking, which primarily occurs in the grate, furnace, and heat transfer surfaces. When fuel has a low ash melting point

2026-07-23
Price of 4-ton biomass steam boiler for edible fungi processing plant

My country is a country with a relatively rich variety of edible fungi. There are more than 350 known edible fungi in our country. In order to make full use

2025-10-26
Food factory uses 10-ton biomass steam boiler to make fish meal

Fish meal is a type of rice noodles commonly eaten by Hengyang people for breakfast, and its added raw material is fish. Now, Hengyang's fish meal has develo

2025-09-28
Packaging industry 2 tons of biomass steam boiler, pressure 6kg

What I want to introduce today is a 2-ton biomass steam boiler in the packaging industry, with a pressure of 6 kg. In fact, not all packaging industries use

2025-09-11
8 Tons of Biomass (Burning Rice Bran) Chain Steam Furnace Cost

Rice bran is the part after rice husk and rice cleaning are removed in the process of rice making. The main substances are rice husk, rice husk debris and a

2025-08-28
Price and Fuel Consumption of 4 Tons of Biomass Steam Boiler

The 4-ton 1.25MPa biomass steam boiler is generally in the form of quick assembly and is mostly used for production gas and heating. It is suitable for burni

2025-08-17
Model parameters and installation standards of ZBG group 2 ton fast-loading biomass hot water boiler

1. Quick-loading biomass hot water boiler:Boiler name: fast-loading biomass hot water boiler(1) Rated calorific value of the boiler: ≥1.4MW(2), working pres

2025-07-10
Annual production of 20 tons of medicines procurement 4 tons of DZL biomass boiler

A pharmaceutical factory refers to a factory that produces raw materials such as antibiotics, chemically synthesized drugs, biochemical drugs, and phytochemi

2025-06-12
Price and Energy Consumption Calculation of 4 T/H Biomass Boiler

My country is a country rich in edible fungi. There are more than 350 kinds of edible fungi known in our country. In order to make full use of these resource

2025-06-05
A 10-ton Biomass Steam Boiler for Fish Meal in a Food Factory

Fish meal is a kind of rice noodles that Chinese Hengyang people often eat for breakfast. The raw material is fish. Now, Hengyang's fish meal has developed f

2025-05-29
Products Recommended
Vulcanization Tank
Vulcanization Tank Customized
Pressure: 0.45-1.3MPa (4.5 - 13bar)
DHL Corner Tube Biomass Fired Bo
DHL Corner Tube Biomass Fired Bo 10-160 t/7-112 MW
Pressure: ≤5.29MPa
Biomass Power Plant Boiler
Biomass Power Plant Boiler 10 - 75 t/ 7-52.5 MW
Pressure: ≤5.29MPa
Biomass Fired CFB Boiler
Biomass Fired CFB Boiler 20-280 t/ 14-196 MW
Pressure: ≤5.29MPa
Success Stories
100 Tons CFB Boiler in Zhengjian
100 Tons CFB Boiler in Zhengjian Application: Thermal Power Plant
Capacity: 100 Tons
1 Ton Gas Steam Boiler in Chile
1 Ton Gas Steam Boiler in Chile Application: Rubber Vulcanization
Capacity: 1 Ton/hr
6 ton biomass steam boiler in Ir
6 ton biomass steam boiler in Ir Application: paper industry
Capacity: 6 ton
15 ton diesel steam boiler in Pu
15 ton diesel steam boiler in Pu Application: tire factory
Capacity: 15 ton
Checking Order Quality Test Before Delivery Check Items When Packing Packaging And Transport
Get An Instant Quotation

For all inquiries, please fill in the form below (* are required) to send us a brief message, and we will get back to you as soon as possible.

Product:
* Email:
Tel:
Name:
Boiler fuel:
  • Gas
  • Oil
  • Biomass
  • Coal
  • Waste Heat
  • Other
Application:
  • Textile Industry
  • Central Heating
  • Food Plant
  • Power Plant
  • Chemical Industry
  • Waste Heat Recovery
  • AAC Block Plant
  • Hotel & Resort
  • CHP